Bluff Drive Overpass Groundbreaking Ceremony
Bluff Drive Overpass Groundbreaking Ceremony
Bluff Drive Overpass
Bluff Drive Overpass Groundbreaking Ceremony
Bluff Drive Overpass
Bluff Drive Overpass Groundbreaking Ceremony
Bluff Drive Overpass
Bluff Drive Overpass Groundbreaking Ceremony
Bluff Drive Overpass Bridge Beams
Bluff Drive Overpass Bridge Beams installed on May 29th, 2025
Bluff_Drive_Overpass_Ribbon_Cutting_edit(1)
Bluff Drive Overpass Ribbon Cutting Ceremony August 22, 2025
Sand_Creek_Ribbon_Bluff_Drive
Bluff Drive Overpass Ribbon Cutting - Sand Creek Twp Bd August 22, 2025

TH 169 Overpass Project

The timing for this project is 2024/2025. Check back for updates.
This Project is being managed by Sand Creek Township in cooperation with Scott County and MNDOT.
 
This Project was created as a result of the TH 169 Sand Creek Corridor Study completed in January 2019.
You can find more details about this study by clicking the link below:
 
See Scott County's Project webpage link below:
Berkshire Ave northbound view
Berkshire Ave. Northbound View
Berkshire Ave southbound view
Berkshire Ave. Southbound View

Berkshire Ave. Extension

The timing for this project is 2022.
This project is being managed by Sand Creek Township in cooperation with Scott County and MNDOT.
 

This Project was created as a result of the TH 169 Sand Creek Corridor Study completed in January 2019.

You can find more details about this study by clicking the link below:

https://www.sandcreekmn.org/index.asp?SEC=C32069CE-C3B2-4486-B7A4-17D840EEFB6B&DE=52952A26-EE69-45E7-A946-4AA84B13CE00
 
Update 3/3/2022: Design and Plan locked in. Project bidding to begin in June 2022 and construction is expected to start August 2022.
 
Update 8/30/2022: Construction began on August 8th and is expected to be completed by November 1st.
 
Update 11/2022: Project is complete.
 
Link to MNDOT Project web page:

Sand Creek Township Projects

The following Projects are being managed by Sand Creek Township: